| GENERAL PROJECT INFORMATION | |
| Project Title: | 2024 Street Resurfacing Project |
| Location: | Citywide |
| Project Schedule: | June 2024 – August 2024 |
| Contractor: | All American Asphalt |
| Contact: | Tra’a Bezdecny, tbezdecny@cityofcalabasas.com |
Project Description:
The 2024 Street Resurfacing Project includes asphalt cold-milling, asphalt rubberized hot mix (ARHM) overlay, removals and/or reconstruction of pavement sections, median removal, and raised crosswalk install.
Streets included:
- N. Las Virgenes Road (NB 101 exit to Parkmor Road)
- S. Las Virgenes Road (SB 101 exit to Agoura Road)
- Park Capri
- Daisy Trail
- Clover Trail
- Locust Drive
- Canyon Drive (from Clover Trail to Aster Trail)
- Parkville Road: Installation of Raised Crosswalk between Calamine Drive and Grape Arbor Park entrance
Project Update:
April 7 - May 21, 2025: Installation of a raised crosswalk on Parkville Road between Calamine Drive and Grape Arbor Park entrance.
- This raised crosswalk will provide a safe pedestrian crossing across Parkville for residents of the Saratoga Hills community to access Grape Arbor Park, working similarly to the crosswalk installed on Park Sienna which provides access to Calabasas Lake, slowing vehicles as they approach and drive over the crosswalk.
July 12, 2024: Paving in Highlands completed
July 5, 2024: Paving of the northern portion of Las Virgenes completed
June 14, 2024: Project begins
June 13, 2024: Proposed median removals on Cold Springs and Lost Springs was removed from this project
June 10-13, 2024: All American begins mobilization
May 13, 2024: City awarded contract to All American Asphalt
May 7, 2024: Bids received by City