| GENERAL PROJECT INFORMATION | |
| Project Title: |
Highway Safety Improvements Project (HSIP) Cycle 11 |
| Description: |
This project will complete some elements of the City’s Local Roadway Safety Plan (LRSP) which identifies corridors and intersections that are at a high risk for traffic collisions and proposes and prioritizes proven countermeasures. |
| Location: |
See project location map |
| Status: | In design |
|
Estimated Timeline: |
Design: now – Fall 2025 Construction: Winter 2025 – Spring 2026 |
|
Funding Source: |
|
| Public Meetings: | Upcoming: Traffic and Transportation Commission Meeting – April 22nd 6pm
Past: City Council Meeting – Approval of Funding Agreement (Item 3) |
| Contact: |
Tra’a Bezdecny: |
Project Locations
The project locations included in the Highway Safety Improvements Project (HSIP) Cycle 11 are shown on the map below: Project Location Map.
Work to be completed includes:
- new striping and signage
- retroreflective borders
- near-side signal indications
Signalized intersections Citywide:
- Lost Hills Road at Canwood Street
- Lost Hills Road at Agoura Road
- Las Virgenes Road at Lost Hills Road
- Las Virgenes Road at Meadow Creek Lane
- Las Virgenes Road at A.E. Wright Driveway
- Las Virgenes Road at Willow Glen Street
- Las Virgenes Road at Oak Glen Street
- Las Virgenes Road at Agoura Road
- Las Virgenes Road at Mureau Road
- Parkway Calabasas at Calabasas Road
- Parkway Calabasas at Park Granada
- Calabasas Road at Park Granada
Project Location Map