Old Town Calabasas Sidewalk Replacement Project

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

 

 GENERAL PROJECT INFORMATION
Project Title: Old Town Calabasas Sidewalk Replacement Project
Location: Calabasas Road between Park Granada and the US-101 freeway southbound ramp (Mulholland Dr. & Valley Circle Blvd.)
Public Hearing Dates: City Council Meeting: August 11, 2021 - Item #10
     - Presentation to Council
Calabasas Historic Preservation Commission Meeting: June 2, 2021 - Item #2
Construction Dates: March 14, 2022 
Duration:  Approximately 6 months
FAQs:  Old Town Calabasas Sidewalk Replacement Project FAQs.
Contact:

Jaylen Shin -  Project Liaison: 818-531-3501
Alba Lemus - Associate Civil Engineer: 818-224-1677

 

9/26/22 - All traffic controls have been removed, and all traffic lanes are now open in both directions.  Off street parking is available again, within the Old Town Corridor.

5/27/22 - Pedestrian Detour Plan, Specific to Old Town for the Memorial Day Weekend.

4/5/22 - The Old Town Calabasas Sidewalk Replacement Project began on Monday, April 4th. Construction will require multiple lane closures and parking restrictions, expect delays. If possible, please try and avoid utilizing the Mulholland Dr./ Valley Circle Blvd. off/on ramp.

Project Description:

Beginning in April 2022, the City of Calabasas will replace the sidewalks in Old Town Calabasas. The project has been designed in accordance with the Old Town Calabasas Master Plan and Design Guidelines. Construction is expected to take approximately 6 months and will be phased out to help reduce the impact to the community.

The existing sidewalk material has reached the end of its useful life and now requires continual maintenance and repair. In addition, the City will replace existing streetlights with LED-powered ones, and replace existing sign posts, fencing, and hitching posts. The project will also enhance all crosswalks by installing new in-pavement lighting. These improvements to Old Town will preserve and enhance the “Old West” look and feel while providing pedestrian improvements.

Old Town Trees

Click here for Facts About the New Trees Being Planted in Old Town Calabasas

 

Project Schedule:

The Old Town Calabasas Sidewalk Replacement Project will begin in April 2022. The project will be phased out into 10 segments to minimize disruption to the community and residents. Construction activity for each segment will include removal and replacement of the existing furnishings, demolition of existing sidewalks, tree removals, new landscape/hardscape, rehabilitation of existing crosswalks and installation of stamped concrete sidewalk.

 

Frequently Asked Questions:

Please click here for a list of FAQs.
For further question please call: Jaylen Shin -  Project Liaison: 818-531-3501 or Alba Lemus - Associate Civil Engineer: 818-224-1677

 

OldTownSidewalk2

 

 

OldTownSidewalk1